Home » Products » Casting film production line » PVB/SGP glass intermediate film production line

loading

PVB/SGP glass intermediate film production line

Equipment features:
PVB/SGP glass intermediate film production line is divided into over roll method and water method two process routes, our company is proficient in the two process production process, combined with international advanced technology, can provide the overall turnkey project. The unique screw design maximizes unit production capacity while ensuring product quality. A full set of Siemens PLC control high degree of automation, with a number of automotive glass and building glass production experience.
Availability:
Quantity:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Main technical parameters:

Type

XDC-1200

XDC-2000

XDC-3200

Extruder specification

75Parallel twin screws

95Parallel twin screws

120Parallel twin screws

Width of product

1200mm

2000mm

3200mm

Thickness of Products

0.38-1.56m'm

0.38-1.56m'm

0.38-1.56m'm

Output

400kg/h

600kg/h

800kg/h

Speed

10m/min

10m/min

10m/min

The above technical specifications are subject to change without prior notice.。


Previous: 
Next: 

Quick Links

Product Category

Contact Us

  +86-17806283801
  +86-532-83232838
  info@extruder.cn
 No. 15, Xiangjiang Road, Jiulong Street Office, Jiaozhou City, Shandong Province
 +86-18766256818
Send Us A Message
Copyright © 2023 Qingdao Xindacheng Plastic Machinery Co., Ltd All rights reserved. Technology By leadong.com | Sitemap